Stadium Photo Album

Board of Directors pictured in August 2010 on the new concrete section for seating on the home side.
Pictured : Back row Virgil Nelson; Mike Galliani; Fred Guisti; John Griffiths
Middle row: Janice Luoma; Toby Brazill; John Andersen; Jere Melo; Joe Sutphin
Front Row: Rich Pyorre; Naomi Sallinen; Clara Ekstrom; Elise Boyle; Madeleine Melo; Rick McMillen
Not Pictured: Jennifer Bosma; Chris Brians; Shirley Johnson

Field before leveling and shaping began, looking south

Field before leveling and shaping, looking north. Group of redwoods on left was removed and the entire track and field was excavated. The old track was 3 ft higher in elevation on the south end than the north. 800 truckloads of soil was brought in to build the berm around the new field.

Local truckers volunteered and hauled over 800 loads of soil to compact for the berms
Another trucker bringing another load of dirt

Earth moving and getting field level 1995-96

Approximately 800 truck loads of soil (all donated) brought in to shape the berms for seating on each side 1995-96

Sod placement 1998
Seats purchased from Anaheim Stadium ($10 each) and trucked up by local trucker at no cost. The seats were then refurbished by a local prison camp at no cost.

One of the containers of seats shipped from Anaheim

First use of the new partially completed stadium Sept 1999

Opening night at partially completed stadium 1999

Building the bathrooms and ticket booth

First seats and announcer booth skeleton installed

Home side seating looking south at the track, field and scoreboard, notice additional space for billboard advertising

Example of the seat sponsorship plaque that can be purchased for $150

Playing field and visitor seating looking from home side seating 2004, notice 4'x8' billboards which can be purchased for $3,000 for a 10 year period.

Field looking north at visitor seating and billboards from Home side.

Completed portion of home side seating (approx 60%) and announcer booth in 2004. At right, the portion of home side berm yet to have concrete poured so seats (already acquired) can be placed.

Bathrooms and ticket booth nearing completion in 2004, copper roof on the ticket booth

Interior of bathroom 2004

Individual seating and sponsorship at the stadium 2004

Concession Stand nearing completion 2004

Some of the soil used in forming the berms

Walkway and scoreboard

March 2008 view of home side seating and section yet to go
|